Seaburn Seafront sealed with Resiblock

As part of a £1 million package of improvements, Resiblock and the ’22’ A.F product has been specified for use on the walkways outside Stack Seaburn and the Seaburn Inn, to provide long term stain protection and to prevent paver destabilisation.

The improvements, which saw repaving works carried out to replicate the look of the eastern promenade, complements an overall £10 million project that was completed in 2021.

Resiblock have established their success in cases across the North-East at Port of Tyne and Sea Road, South Shields, and this latest installation goes to show the trust that Local Authorities place in the Resiblock name.